Pick a trade.
Or take all four.

Each service below has its own deep page — system specs, finish options, and recent project examples. If your scope touches more than one trade, talk to us about a combined bid. We almost always save the GC schedule by sequencing them internally.

01 · LATH

Lath installation

02 · STUCCO

Stucco exterior

03 · DRYWALL

Drywall finishing

04 · SCAFFOLD

Scaffold and access protection

01 — LATH

Substrate done right.

Galvanized self-furring metal lath over two layers of Grade-D paper, on wood-frame, steel-stud, or CMU backup. Weep screed set, corner beads true, expansion joints on the plan. Lath details →

02 — STUCCO

Exterior, weather-tight.

Cement stucco for exterior walls — modern one-coat or traditional three-coat. Properly detailed terminations, control joints, and integration with windows and flashings. Stucco details →

03 — DRYWALL

Hang, tape, finish.

Level 4 and Level 5 finishes for plaster transitions, retrofits, and tenant improvements. Coordinated with the plaster scope so the wall reads continuous. Drywall details →

04 — SCAFFOLD

Access without drama.

Scaffold coordination, access planning, protection, and staging for exterior plaster and stucco work. Crews get clean reach without slowing the schedule. Scaffold details →

How We Run a Job

Seven phases,
same on every project.

The job's the same whether it's a single-trade scope or a full lath-through-interior-plaster package: walk the site, lock the spec, bid honest, inspect the substrate, apply the coats, punch with your super, and stand behind the work for two years after.

See the full 7-phase process →

Ready to bid?

Send us the plans. We'll
send back a real number.

Request a Bid